Steelton Hill Double Track

Steelton Hill Double Track

ProSource provided the following services for the construction of the 4.7 mile double track on Steelton Hill located in Duluth, MN. The double track essentially added a passing lane for the 20 to 25 freight trains that operate through the freight corridor each day.  

  • Acquired land, temporary workspace/access roads
  • Conducted inspections of the project areas, and examine maps and design drawings to determine the needed land parcels and other land issues.
  • Prepared Title Certificates by abstracting documents of record and examination to determine marketable title and the existence of other easements, etc.
  • Drafted the landowner base map used for environmental, geotechnical and land title work.
  • Management of survey work and the quality control review of drawings and legal descriptions from the surveys.
  • Drafted and distributed a project information letter to the involved owners and other interested parties and conducted ongoing problem solving meetings.
  • Preparation of purchase and conveyance documents, to obtain a right of entry and a fee or easement interest in the land.
  • Managed the work of appraisers in determining the market value of a land parcels.
  • Negotiated the purchase of easements and fee parcels and the settlement of construction damage claims and the closing of the purchase transactions.
  • Resolved damage claims of landowners resulting from preconstruction environmental inspection, geotechnical testing s and survey activities.
  • Issued payment checks to landowners on behalf of CN and coordinate the closing of real estate transactions.